Today we closed on the land! We are now proud owners of a giant pile of dirt! This was super exciting for us even though the land is still several weeks away from being ready to build on.

The land is located in Lehi by the rodeo grounds and is in a new culdasac development. We were so fortunate to find this piece of land and were able to get it at a great price.

Lately we have been doing a lot of leg work for the city and also trying to get all of our sub contractors lined up. We're finding it very hard to get a hold of excavation and foundation companies and are a little worried that they will be booking out until mid-summer. We also found out that our construction loan will only be for a term of 6 months. We can extend it if necessary, but it will cost us more. So for now we have our goal set up to move in at Christmas time. It's ambitious, but we have a lot of determination to get this house finished as fast as possible.

Everything is still a waiting game right now but we're learning a lot about the building process and are starting to get all our ducks in a row. By the end of this process we will most definitely be experts.






Comments

Popular posts from this blog

That's One Big Hole

Today we got our excavation hole dug. Not gonna lie, I've been a nervous wreck, but there's no turning back now! We had to make a few last-minute changes, one of which was changing the basement walls to be 9 feet instead of 8. Our lot is so low that they needed to be able to dig down more rather than bring in a ton of extra dirt/rock. We will still have to bring in a lot of fill dirt to build up the land but thats a lot easier than trying to bring in seismic rock to build up the foundation. We're also hoping to change the way the walkout basement works since it most likely wont need as many steps as the original plan called for. We learned a few more things this week that we had no clue about (ummm...damp-proofing?!) Footings are planned for late next week and the foundation the week after that. Once those two things are done we'll be able to let out a huge sigh of relief. These two big steps had a lot of unknowns for us and were a little out of our realm. Luckily, ...

Excuse me while I drool…

We got our exterior finished this week and I can’t stop drooling over it! It’s even more beautiful than I imagined. It makes such a difference to have all these finishing touches on and to see it all put together. Big shout-out to Stuccoworks II for the incredible job on the exterior. I literally sent them a mockup of what I wanted it to look like and they completely nailed it. It was so great working with them and trusting them with the exterior so we could focus on the inside of the house. Pat has been working his tail off hanging drywall for the last 3 weeks and just got his inspection passed! We still have to tape, mud, and texture, but I’d say the hardest part is done. We got our furnace and fireplace up and running, electricity hooked up, and garage doors installed all this week so its been really exciting to see things moving along. Our move-in deadline is the first week of March. Its still a pretty steep deadline but hopefully we can keep plugging away at all the od...

Welcome to House of Hooley!

As we start our journey of building our dream home we wanted to chronicle the good, the bad, and the ugly. We invite you to join us on the ride of our lives as we start the process. Here we will give weekly updates, add pictures, and even ask for opinions on decisions we have to make, as there will be many and we are open to any/all advice and input. So sit back, kick up your feet, and let us do all the hard work.  With love, The Hooley's